Highway 190

Client: Lower Tule River Irrigation District
Sector: Water
Services: Construction Management
Duration: 5/2014-11/2014

We managed the relocation of a berm and headwall along Hwy 190 in Tipton. The scope of work extended to the bidding process, which included posting public notices, managing the public bidders list and compiling a formal set of plans for the relocation, surveying, dust control and reporting. During construction 4C Global provided on-site quality assurance and provided Caltrans and the Lower Tule River irrigation District with as-built plans of improvements. Upon concluding construction, 4C Global managed all soil, subgrade compaction and concrete testing on the structure.